Interior dimensions: 22" L x 12.5" W x 16" H
Exterior dimensions: 26.50" L x 15.50" W x 19.75" H
The Everything Mary XXL Rolling Sewing Tote was designed with larger sewing & embroidery machines in mind. The XXL sewing bag on wheels is nothing short of premium. Our sewing machine storage case is constructed with a beautiful, high-quality polyester material that is smudge-proof and easy to clean. Featuring the interior dimension of 22" L x 12.5" W x 16", this carrying machine case keeps your valuable Brother, Singer, Bernina, Babylock, Viking, or any other large sewing machine case safe and concealed. Along with large sewing machine storage, this case features multiple storage pockets, a locking handle, convenient carry straps, an interior machine strap, and 4-wheel Quad Rollers. The Everything Mary XXL Rolling Sewing Tote was made with crafters in mind.